Power trowel is a construction machine used to impart a smooth surface finish on freshly poured concrete slabs. This machine consists of one rotor which rotate parallel with the slab surface.
Discs or multi-bladed attachments are spun against the still soft concrete surface by the rotors, thereby effectively smoothing out any blemishes or high spots.
Technical Data
Power trowel Periodic Maintenance Schedule
![](/u_file/1911/photo/3043adaaf8.jpg)
![](/u_file/1911/photo/157952fc71.jpg)
![](/u_file/1911/photo/3abffd32ff.jpg)
![](/u_file/1911/photo/e3977a1d4f.jpg)
![](/u_file/1911/photo/d74b5ba541.jpg)
![](/u_file/1911/photo/b68bdcb0c5.jpg)
![](/u_file/1911/photo/b0b3f547db.jpg)
![](/u_file/1911/photo/b380a166e3.jpg)
![](/u_file/1911/photo/f8aaa0757d.jpg)
Discs or multi-bladed attachments are spun against the still soft concrete surface by the rotors, thereby effectively smoothing out any blemishes or high spots.
![](/u_file/1911/photo/5afae41250.jpg)
Model | WH-S100H | WH-S100R | WH-S100L | WH-S100S |
Engine | Honda GX160 | Robin EY20 | Loncin G200F | B&S1062 |
Engine type | Air-cooled single cylinder 4-stroke | |||
Power (HP) | 5.5 | 5.0 | 6.5 | 5.0 |
Trowel diameter (cm) | 92 | |||
Speed range (r/min) | 60-100 | |||
Pitch range | 0-15° | |||
Operating weight (kg) | 96 | 96 | 96 | 96 |
Shipping weight (kg) | 106 | 106 | 106 | 106 |
Shipping size (cm) | 100*100*36 |
Engine Periodic Maintenance Schedule | ||||||
Performed at every indicated month or operation hours interval, whichever comes first. | REGULAR SERVICE PERIOD | |||||
Item | Directive | Each use | First month or 20 Hrs. | Every 3 months or 50 Hrs. | Every 6 months or 100 Hrs. | Every year or 300 Hrs. |
Engine oil | Check level | √ | ||||
Change | √ | √ | ||||
Air cleaner | Check | √ | ||||
Clean | √(1) | |||||
Replace | √* | |||||
Sediment cup | Clean | √ | ||||
Spark plug | Check-Clean | √ | ||||
Replace | √ | |||||
Idle speed | Check-Adjust | √(2) | ||||
Valve clearance | Check-Adjust | √(2) | ||||
Fuel rank and strainer | Clean | √(2) | ||||
Combustion chamber | Clean | After every 300 Hrs. (2) | ||||
Fuel line | Check | Every 2 years (Replace if necessary) (2) | ||||
* Replace the paper element type only. | ||||||
(1) Service more frequently when used in dusty areas. | ||||||
(2) These items should be serviced by your servicing dealer unless you have the proper tools and are mechanically proficient. Refer to manual for service procedures. |
Directive | Daily before starting | After first 5 Hrs. | After first 50 Hrs. | Every week or 25 Hrs. | Every month or 100 Hrs. | Every 3 months or 300 Hrs. |
Check oil level of machine | √ | |||||
Check fuel level line and fittings for cracks or leaks | √ | |||||
Check and tighten engine clylinder screws | √ | √ | ||||
Check and tighten external hardware | √ | √ | ||||
Check V-belt | √ | |||||
Clean engine cooling fins | √ | |||||
Clean recoil starter | √ | |||||
Change gearbox oil | √ | √ | ||||
Clean engine muffler and exhaust port | √ | |||||
Note: If engine performance is poor, please check, clean and replace air filter elements as needed. |
![](/u_file/1911/photo/3043adaaf8.jpg)
![](/u_file/1911/photo/157952fc71.jpg)
![](/u_file/1911/photo/3abffd32ff.jpg)
![](/u_file/1911/photo/e3977a1d4f.jpg)
![](/u_file/1911/photo/d74b5ba541.jpg)
![](/u_file/1911/photo/b68bdcb0c5.jpg)
![](/u_file/1911/photo/b0b3f547db.jpg)
![](/u_file/1911/photo/b380a166e3.jpg)
![](/u_file/1911/photo/f8aaa0757d.jpg)
![](/u_file/1911/photo/9b8468ed09.jpg)